Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings, Unpublished PhD Thesis, , University of Dundee.

Almalki, T S (2015) A study of the influence of trust on the relationships between team members in engineering projects, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs, Unpublished PhD Thesis, , University of Dundee.

Chitengi, H S (2015) Deriving lessons for urban planning and housing delivery from the resilience of informal housing systems in Zambia, Unpublished PhD Thesis, School of Social Sciences, University of Dundee.

Forbes, D (2008) Identification and analysis of risks in the sustainability assessment of housing, Unpublished PhD Thesis, , University of Dundee.

Gaber Abubakar, A (2016) Factors affecting maintenance labour productivity in the building industry, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

  • Type: Thesis
  • Keywords: maintenance; labour; productivity
  • ISBN/ISSN:
  • URL: https://discovery.dundee.ac.uk/files/8870642/Factors_Influencing_Maintenance_Labour_Productivity_in_the_Building_Industry.pdf
  • Abstract:
    The research explored ways for improving maintenance labour productivity and reducing maintenance costs. This can be achieved through reducing the number of maintenance activities and by improving the productivity of labour carrying out repair and maintenance tasks. The research established that Integrated Logistics Support (ILS) techniques, in particular, Failure Modes and Effects Analysis (FMEA) and Reliability Centred Maintenance (RCM) could be applied to building systems, in this case to the maintenance of Rainwater Goods to identify the most applicable and cost effective maintenance strategy. As a result it was found that while 60% of failure modes identified could be rectified by employing a Failure-Based Maintenance strategy, 40% of the failure modes require a Condition-Based Maintenance strategy which is not currently applied. Labour productivity is a subject of tremendous interest to research in the construction industry; the study found however, very little research on the productivity of labour in building repair and maintenance operations. It was found that measurement of building maintenance labour productivity has not been the focus of any previous studies. Indeed no measures of productivity for building maintenance were identified. Having considered a number of alternative measures, the research identified the productivity index expressed in terms of Estimated Hours/Actual hours to be the most appropriate measure of labour productivity in repair and maintenance operations. Using this measure, it was established that labour productivity is impacted by a number of variables including task performance, labour performance, material usage and seasonal variability. Among the objectives of the research was to identify the factors influencing labour productivity. Through a survey questionnaire, it was possible to identify the factors that have the greatest impact on maintenance labour productivity; these were the level of skills and motivation of workmen; quality of information and work instructions; labour turnover and absenteeism; availability of tools and material, and access to the job site. The analysis of historical repairs data from two building repair and maintenance organisations revealed that during the performance of the same tasks, one of the data sources was almost 25% more productive than the other. The research has established that there is a potential for improving labour productivity carrying out building repair and maintenance.

Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling, Unpublished PhD Thesis, School of Science and Engineering, University of Dundee.

Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model, Unpublished PhD Thesis, , University of Dundee.

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Noor, I (1992) A study of the variability of labour productivity in building trades, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Simon, M (2010) The commitment to corporate social responsibility of construction companies in the United Kingdom and Germany, Unpublished PhD Thesis, , University of Dundee.

Taha, M (2022) Identifying legal frameworks impacting institutional investors' participation in infrastructure projects, Unpublished PhD Thesis, , University of Dundee.

Talhouni, B T K (1990) Measurement and analysis of construction labour productivity, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Thomson, C S (2006) A study of the innovation process within the construction project environment, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Ward, S A (2015) Critical success factors for lean construction intervention, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Whitehead, R C (1995) Factors influencing labour productivity on construction sites, Unpublished PhD Thesis, , University of Dundee.

Zakieh, R (1991) Quantity-significance and its application to construction project modelling, Unpublished PhD Thesis, , University of Dundee.